Changes to... in Process...
I have decided to switch to 1 by 4's instead of the 2 by 4's I had been using. I didn't care for the way looked upon the cylinder core. I am also had a little difficulty with the placement of the strips with the tweezers that I have and have made some alterarions to my pair so that they may hold the very fine bits of strips.
A last minute thought: I wish I add alternated between the 1 by 4 and 2 by 4's. It would have created a nice effect.
Materials for...
I am pulling materials together for the robot vermin number four. What you see here is the unit under construction. I used a floss role for the body, wrapped a very this strip of styrene around the bottem, and I startd to add styrene strips to the top half. Below are a strip of 1mm round rod and a strip of HO guage 2 by 4 material. The piece of to the right is something I picked-up in my travels. Not pictered here are the are rivets I fachioned from a piece of 1mm round rod. They will be added to the white band at the bottum of the unit. I haven't decided on how this unit will be propelled yet.
No comments:
Post a Comment