I feel that I am behind my goal of completing at least one project per month. Perhaps I will surpass my goal this month. Here is the current state of my workbench. There are componnets for two HO scale structures here. One, a small tarpaper shack and two, a dilapidated clapboard shack.
From the top left to right and then clockwise: scale tarpaper strips, 9" scale clapboard strips, two clapboard walls, one completed, weathered, and dry-brushed. The other is under construction. Two battens for the tarpaper shack lay on the wall panel on the left, two walls for the tarpaper shack, one being weighed down after having had stripwood added to the underside to strengthen the side walls. I used bassword for this.
No comments:
Post a Comment