I have been very slow getting any type of project started, this month, and then to continue working with it. However, I recently started working on a new series named swamp shacks.
Shamp Shack 1 Under Construction/ Left and Right Sections
At one time this shack might have been constructed of one type of material, but over time parts of the shack were replaced with whatever was avialable adding to its shoddy appearence.
I used wood strips to create a interior framework so that I could model gaps between the mostly plywood sheets. This series of strucures is being built for an addtion to my narrow gauge Bath River railway.
No comments:
Post a Comment